Barro Blanco Hydroelectric

The project consists of a central control house at the foot of the damn, located on the site “The Philippines” with UTM coordinates E 434,518.267, 908,060.018 N WGS-84 datum. The project has been conceptualized with a Gravity Dam of 44.91 meters in height above the riverbed. The reservoir level is set at elevation 103 m (According to Information Levels Tommy Guardia National Geographic Institute). The coronation of the dam will be located at an altitude of 109 meters and will have approximately 424 meters long. The flow rate multi-year site The Philippines, corresponding to 50.30 m3 / s. The Eco Stream project is estimated at 3.5 m3 / s. The Project Design Flow was estimated at 75 m3 / s.